Land Clearing
We clear overgrown lots and acreage around Broxton and the surrounding counties. Brush and small trees come down, and the land opens up for a new home or a farm.
Learn More
Putting a new house or a mobile home on a rural lot near McRae-Helena? Across Telfair County, about one home in four is a mobile home. Inside the city, the share is fewer than one in ten. Most of the county's mobile homes sit out on rural lots. Where public sewer is not available, Georgia's rules call for an approved septic system.
Southern Grind Solutions offers septic tank installation in McRae-Helena, GA for new houses and mobile homes across Telfair County. McRae-Helena is part of our service area, north of Broxton up US 441. When the lot is still pines or brush, land clearing comes first and can be part of the same job. Call or text (912) 381-6261, and we look at the job and put the quote in writing.
Tell us about the new septic system, the land to clear or the dirt work and where it is. We look at the job and put the quote in writing.
Septic permits for McRae-Helena and all of Telfair County come from the county health department at 89 Telfair Avenue. That office is part of the South Central Health District, with its district office in Dublin. Broxton sits in Coffee County, part of the Southeast Health District. So a septic permit here runs through a different district than one in Broxton.
The South Central district's onsite sewage program issues septic tank permits and does site evaluations. An Environmental Health Specialist inspects each permitted system under the state's septic rules, Chapter 511-3-1. Georgia's rules say the application goes in on forms the county board of health provides. The district sends people to their county health department for county forms.
Our septic tank permit guide covers Georgia's rules using the Southeast district's form, the one Coffee County uses. For a Telfair County lot, ask the Telfair County office for its own form. Under the state rules, the owner or the owner's agent signs the application. The county board of health acts on a complete application within 20 days.
A permit is issued only after a site inspection looks at the soil, the groundwater and rock. When the county calls for a soil report, a soil classifier does that work. Georgia's rules define a soil classifier as a person the state health department approves to do soil evaluations. Our perc test guide explains the soil step.
Southern Grind Solutions builds the tank and drain field the permit lays out. A permit is good for up to 12 months from the date it is issued. Nobody may backfill or use the system until the county makes a final inspection and approves it in writing.
McRae-Helena is the county seat and the largest city in Telfair County. It was formed on January 1, 2015, when the cities of McRae and Helena merged. The merger started when Helena found it could no longer manage its wastewater. The 2020 Census counted 6,253 people here. That count includes the people held in the city's two prisons.
Today the city's Public Works Department works on the water and wastewater systems. So a lot inside the city starts with a call to the city about sewer. Georgia's rules require a sewer hookup when a public sewer is available within 200 feet of the property line. Where public or community sewer is not available, the owner must provide an approved septic system.
Census Bureau survey figures count 1,198 mobile homes among Telfair County's 4,705 homes. Inside McRae-Helena, the count is 180 of 1,947 homes. The median home in the city was built in 1973, and the median home in the county in 1979. So the new houses and mobile homes that need their own septic system mostly go onto rural county lots.
McRae-Helena sits in northern Telfair County. The Little Ocmulgee River flows just northeast of the city limits. Sugar Creek passes through the city's southwest edge. The northern part of the county drains to the Little Ocmulgee River, part of the Altamaha River basin. South of a line from Milan east to Lumber City, the land drains to the lower Ocmulgee River.
A lot near a creek or the river brings its own septic rules. Georgia's rules keep a drain field at least 50 feet from the normal water level of a stream. A septic tank must sit at least 25 feet from lakes, ponds and streams.
Wells count too. A drain field must sit at least 100 feet from a well, and a septic tank at least 50 feet. Georgia's septic manual also calls for at least 24 inches between a trench bottom and the seasonal water table.
Low ground matters as well. The manual says areas subject to frequent flooding should not be considered for a septic system. A soil map is only a starting point, since the manual requires on-site analysis of the soil. The county's site inspection decides whether the lot works and where the lines go. For the home itself, a mobile home pad raises the site so water drains away from under the home.
Telfair County borders Coffee County to the south. North of Broxton, US 319 and US 441 cross the Ocmulgee River at the Coffee and Telfair county line. The road then runs north through Workmore into McRae-Helena. In town, US 280, US 319 and US 441 run together as Third Avenue. They cross US 23 and US 341 in the center of the city.
Downtown, Liberty Square holds a Statue of Liberty replica one-twelfth the size of the original. The square also has a Liberty Bell replica. Telfair County covers 444 square miles, and Lumber City, Milan and Scotland are among its other towns. From town, US 319 and US 441 run 35 miles north to Dublin. US 23 and US 341 run 24 miles southeast to Hazlehurst.
A house site around McRae-Helena may start as pines and brush or an old field. Forestry mulching grinds underbrush and small trees in place and leaves the mulch on the ground. Bush hogging knocks down a grown-up field so the house location can be staked.
Some lots hold an old house or a mobile home that has to come down first. Our demolition work takes the structure down and cleans the debris off the lot. Then site preparation rough grades the building area for the house or the pad.
The tank hole and the drain field trenches are dug with an excavator, which is excavation work. Georgia 811 asks for a locate ticket at least 3 business days before digging. Tell us the plan for the whole lot. The clearing and the septic work can go on one written quote.
Communities and areas we serve around McRae-Helena: Liberty Square, Third Avenue, Little Ocmulgee State Park, Little Ocmulgee River, Sugar Creek, Workmore, Lumber City, Milan, Scotland, US 441, US 280, US 23.
McRae-Helena ZIP codes served: 31055.
McRae-Helena is part of our service area. We look at the job and put the quote in writing.
(912) 381-6261
We clear overgrown lots and acreage around Broxton and the surrounding counties. Brush and small trees come down, and the land opens up for a new home or a farm.
Learn More
We grind underbrush and small trees in place with a forestry mulcher. The mulch stays on the ground and covers the soil.
Learn More
We dig trenches, drainage ditches, culvert crossings and footings with an excavator. We also do the dirt work for new septic systems and mobile home pads.
Learn More
We tear down old houses, mobile homes, barns and sheds on rural lots and in town. Then we clean up the debris from the site.
Learn More
Built-up, graded pads of fill dirt so rain drains away from under your mobile home. We clear the home site first, then pack and grade the fill.
Learn More
We get a raw lot ready for a new house or a mobile home. The clearing, the rough grading, the pad and the septic system come as one job.
Learn More
We cut grown-up pastures and lots back down with a brush cutter. Overgrown fence lines get cut back too, and the cut grass stays where it falls.
Learn More
We cut shooting lanes and access trails through brush and pines on hunting land. We also clear the ground for food plots, and the planting stays yours.
Learn MoreA few of the questions we hear most around McRae-Helena. If yours is not here, call or text and ask.
Building a house or moving into a mobile home? Call or text (912) 381-6261 or use the form, and tell us which county the job is in.
Tell us about the new septic system, the land to clear or the dirt work and where it is. We look at the job and put the quote in writing.